The Avenue 9 overcrossing in Madera County was opened to traffic in November. The structure spans 177-feet long and more than 66 feet wide and takes traffic over the future high-speed rail tracks. Avenue 9 is the 10th structure to be completed this year.
Avenue 9 Overcrossing
