This April, crews are working overnight to place 14 of the 28 pre-cast concrete girders needed for the superstructure of the Belmont Avenue Grade Separation. These girders range from 148 to 158-feet long, are nearly 6-feet tall, and can weigh as much as 185,000 lbs. each. Crews have completed the foundation for the abutment on the east side of the structure and are currently installing rebar and forming the abutment wall.