At the north end of Construction Package 1 in Madera County, a dozer operator moves and compacts the dirt being hauled in to build up the north side of the Road 27 overcrossing. Eventually the fill will reach the level of the bridge deck when it will be paved. The overcrossing will take Road 27 traffic over an existing BNSF line and the future high-speed rail line.