Located in Kings County, east of State Route 43 and south of Cairo Avenue, the Kings River Bridge will take high-speed trains over the Kings River waterway. The structure will measure 445 feet long and 43 feet...
East of State Route 43 and north of Ninth Avenue in Fresno County, the Dutch John Cut Bridge will take high-speed trains over the Dutch John Cut waterway that connects to the Kings River. The structure will measure 669 feet long and 43 feet...
Located in Fresno County, the Peach Avenue Viaduct will span 306 feet long, 43 feet wide, and will take high-speed trains over Peach Avenue. Feet Long Feet...
On July 15, 2024, the California High-Speed Rail Authority announced the completion of the Floral Avenue Grade Separation. This grade separation will span approximately 381 feet long, 40 feet wide, and will take traffic over the existing rail and future high-speed...
The Avenue 17 Grade Separation is one of the latest construction sites to break ground this year. Located between Lake Street and Road 28 ½ in Madera County, crew members have been busy on the foundations and substructure on both sides of the existing train tracks....