The 1,600-foot structure will carry high speed trains over the Fresno River and State Route 145 outside of the town of Madera. Construction on the the Fresno River Viaduct began in the summer of 2015 and is now fully complete.
Madera,California
CentralRegion
Phase 1
Merced to Fresno
Construction Package 1
Viaduct
Location:Between Raymond Road and Watson Street in Madera County, crossing State Route 145 and the Fresno River, parallel to the BNSF railroad tracks.